01 — WHY PART 145
Repair stations came out on top.
We compared a range of regulated industries before deciding where to build. Repair stations came out on top for four reasons.
The work product is documentation.
A repaired component ships with an FAA Form 8130-3 and the trace behind it. Without them the part has no value.
The rules change slowly.
14 CFR Part 145 defines what your quality system (145.211) and your records (145.219) must cover. Software built against a stable rule keeps working.
The work suits software.
Tags, certs and trace documents are scanned, emailed, filed and re-keyed. Reading and checking documents is something software now does well.
It is on our doorstep.
Florida is one of the leading states for repair stations. The shops in Miami, Opa-locka, Hialeah and Fort Lauderdale are a short drive from us.
02 — WHY ENGENIOUS
We do not start from zero.
Three things put us in a position to build for repair stations that a generalist vendor cannot match.
A library of proven automation modules.
We have spent years building products for hundreds of customers across multiple industries, and we kept what worked. The result is a large library of tested modules, some AI and many not: document capture and extraction, data validation, system integrations, reporting and alerting. Your pilot is assembled from parts already proven in production, not written from scratch.
A world-class team of builders.
We have spent our whole working lives building products and solutions. It is all we do, and clients rate our work 4.8 out of 5 on Clutch.
4.8/ 5 CLIENT RATING ON CLUTCH
We are here in Florida.
We are not a remote vendor. Discovery, rollout and support happen in person, and if something needs attention we can be in your shop the next business day.
What we are not is aviation people, and we do not pretend to be.
That is why we are running the benchmark below, why every engagement starts with a week in your shop, and why your quality manager approves every step.
03 — THE PART 145 DOCUMENTATION BENCHMARK
Going deep into an industry means measuring before building.
So we are running a benchmark study, and we are inviting 40 quality managers at component and accessory shops to take part.
WHAT WE MEASURE
How much time documentation takes per unit, from receiving inspection to release, and where that time goes. We could not find a published number.
WHAT IT TAKES
Eight questions and fifteen minutes: online, by phone, or in person at your shop.
WHAT YOU GET
The aggregated results before we publish them, so you can compare your shop with your peers.
WHAT WE PROMISE
No shop names, no certificate numbers and no attributed quotes. Afterwards you hear from us twice: once with the results, and once to ask whether you would like to talk further. If you say no, that is the end of it.
The benchmark is the lightest way to start a conversation with us. Below is how an engagement runs if you want to go further.